188宝金博页面版

  • 图案背景
  • 纯色背景
视图
标记
批注
批注本地保存成功,开通会员云端永久保存 去开通
2061786923

上传于:2016-03-24

粉丝量:5

该文档贡献者很忙,什么也没留下。


  • 相关
  • 目录
  • 笔记
  • 书签

188宝金博页面版:更多相关文档

  • schedule

    星级: 4 页

  • SCHEDULE D

    星级: 7 页

  • SCHEDULE 9

    星级: 5 页

  • Schedule 3

    星级: 7 页

  • for the Schedule 5 - SCHEDULE 5

    星级: 4 页

  • SCHEDULE “C”

    星级: 4 页

  • Schedule T

    星级: 4 页

  • Schedule 2 SCHEDULE OF PAYMENT

    星级: 4 页

  • Schedule 4 DAYWORK SCHEDULE

    星级: 1 页

  • Schedule – I

    星级: 72 页

  • SCHEDULE模块

    星级: 4 页

暂无目录

点击鼠标右键菜单,创建目录

暂无笔记

选择文本,点击鼠标右键菜单,添加笔记

暂无书签

在左侧文档中,点击鼠标右键,添加书签

188宝金博页面版: SCHEDULE TO THE LAND SUBJECT TO INUNDATION …

下载积分: 3000

内容提示: B ALLARAT P LANNING S CHEME L AND S UBJECT TO I NUNDATION O VERLAY – S CHEDULE P AGE 1 OF 2 SCHEDULE TO THE LAND SUBJECT TO INUNDATION OVERLAY Shown on the planning scheme map as LSIO 1.0 Permit requirement A permit is not required for the following: Replacement buildings ? If the footprint of the replacement building(s) is the same or less than the original building; and ? If the floor level of the building is finished at least 300 mm above the 1% AEP flood level, or a higher level set by the flood...

文档格式:PDF | 页数:2 | 浏览次数:14 | 上传日期:2016-03-24 07:25:15 | 文档星级:
B ALLARAT P LANNING S CHEME L AND S UBJECT TO I NUNDATION O VERLAY – S CHEDULE P AGE 1 OF 2 SCHEDULE TO THE LAND SUBJECT TO INUNDATION OVERLAY Shown on the planning scheme map as LSIO 1.0 Permit requirement A permit is not required for the following: Replacement buildings ? If the footprint of the replacement building(s) is the same or less than the original building; and ? If the floor level of the building is finished at least 300 mm above the 1% AEP flood level, or a higher level set by the floodplain management authority; and ? If the building is on stumps or piers with unenclosed foundations. External alterations to existing buildings ? If the original building footprint remains the same. Extensions to existing habitable buildings ? If the floor level of the extension is at least 300mm above the designated 1% AEP flood level; and ? If the building footprint extension is no larger than 40 sq.m. Addition of a storey or storeys above an existing building ? If there is no increase in the ground floor building footprint. Dependent persons unit ? If the floor level is at least 300mm above the designated 1% AEP flood level; and ? If the building footprint is no larger than 40 sq.m. New or replacement fence (other than repairs and routine maintenance) ? If the fencing complies with the Catchment Management Authority Guidelines for Fencing in Flood Prone Areas. Earthworks ? If the earthworks comply with the Catchment Management Authority Guidelines for Floodplain Cut and Fill. Other buildings and works (including extensions to existing buildings) ? A pergola, carport, outbuilding, domestic shed, animal enclosure or agricultural shed that is open on all sides and (if not at ground level), has unenclosed foundations. ? A verandah or decking area with a floor raised on stumps or piers and with unenclosed foundations. ? Road works or works to any other access way (public or private) that: o do not change the finished level of the road surface; or o are limited to resurfacing of an existing road. ? Bicycle or pedestrian paths where there is no alteration in the natural ground level. ? Works associated with agriculture, apiaries, vine or horticultural trellises or watering systems. ? Works and routine maintenance that do not affect the height, length, width or location of a levee or embankment. ? A rainwater tank with a capacity of not more than 4500 litres. ? A pump shed. ? A tennis court (where there is no alteration in the natural ground level) and with associated fencing designed to minimise obstruction of flows. --/--/2015 C178 --/--/2015 C178

188宝金博页面版:关注我们

  • 新浪微博

关注188宝金博页面版公众号

188宝金博页面版
阅读
APP
阅读
返回
顶部
188宝金博页面版官网登录在线平台入口(2026已更新)—江苏协昌电子科技股份有限公司