188宝金博页面版

  • 图案背景
  • 纯色背景
视图
标记
批注
批注本地保存成功,开通会员云端永久保存 去开通
loveone20

上传于:2016-03-24

粉丝量:4

该文档贡献者很忙,什么也没留下。


  • 相关
  • 目录
  • 笔记
  • 书签

188宝金博页面版:更多相关文档

  • Centre for Service Research What Service Science offers to Business

    星级: 13 页

  • Service Proposal new

    星级: 10 页

  • blackberry opt service proposal

    星级: 8 页

  • service proposal shanghai a

    星级: 8 页

  • service proposal new

    星级: 11 页

  • Customer Service Centre

    星级: 4 页

  • Environmental proposal - International Centre for ...

    星级: 23 页

  • SEN Support Service Centre - Derbyshire

    星级: 8 页

  • Internet Service Provider Proposal Form

    星级: 5 页

暂无目录

点击鼠标右键菜单,创建目录

暂无笔记

选择文本,点击鼠标右键菜单,添加笔记

暂无书签

在左侧文档中,点击鼠标右键,添加书签

188宝金博页面版: SONILS OIL SERVICE CENTRE – LUANDA PROPOSAL …

下载积分: 3000

内容提示: Page 1 of 7 3136/93A 8 th September 2007 SONILS OIL SERVICE CENTRE – LUANDA PROPOSAL TO CONSTRUCT A DIESEL STORAGE FACILITY Summary The purpose of this specification is to outline the general requirements for the Diesel Storage Tank Farm and installation of Fire-Fighting Facility. The site will store in total 98 250 m? of Diesel. This would most economically be done using 3 tanks, having a volume of approximately 33 000 m? each. The configuration, in terms of SABS 089, would typically be: 1. Each ...

文档格式:PDF | 页数:10 | 浏览次数:44 | 上传日期:2016-03-24 11:03:11 | 文档星级:
Page 1 of 7 3136/93A 8 th September 2007 SONILS OIL SERVICE CENTRE – LUANDA PROPOSAL TO CONSTRUCT A DIESEL STORAGE FACILITY Summary The purpose of this specification is to outline the general requirements for the Diesel Storage Tank Farm and installation of Fire-Fighting Facility. The site will store in total 98 250 m³ of Diesel. This would most economically be done using 3 tanks, having a volume of approximately 33 000 m³ each. The configuration, in terms of SABS 089, would typically be: 1. Each with a diameter of 54 m and a tank height of 14.4 m with 100 mm freeboard. 2. The tanks would be fixed roof tanks. 3. The bund height would be approximately 3.1 m high, including the 100 mm freeboard. 4. Only Diesel should be stored on the site. 5. Due to the location of the site and other activities around the site fire protection should as a minimum be provided by: a. Fixed cooling rings for the cone roof and the tank shell b. Fixed foam pourers on the tanks c. Fixed foam pourers on the bund areas

188宝金博页面版:关注我们

  • 新浪微博

关注188宝金博页面版公众号

188宝金博页面版
阅读
APP
阅读
返回
顶部
188宝金博页面版官网登录在线平台入口(2026已更新)—江苏协昌电子科技股份有限公司