188宝金博页面版

  • 图案背景
  • 纯色背景
视图
标记
批注
批注本地保存成功,开通会员云端永久保存 去开通
maturin

上传于:2015-05-27

粉丝量:74

工程与项目管理的专家。


  • 相关
  • 目录
  • 笔记
  • 书签

188宝金博页面版:更多相关文档

  • SYT 6484-2000气举井的操作、维护与故障检查的推荐作法

    星级: 28 页

  • SY-T 6484-2000 气举井的操作、维护与故障检查的推荐作法

    星级: 29 页

  • 气举井的操作、维护与故障检查的推荐作法

    星级: 27 页

  • SY-T 6484-2000 气举井的操作、维护与故障检查的推荐作法

    星级: 27 页

  • 气举井操作、维护及故障诊断推荐作法

    星级: 31 页

  • SY-T 6484-2005 气举井操作、维护及故障诊断推荐作法

    星级: 31 页

  • SY-T 6484-2005 气举井操作、维护及故障诊断推荐作法

    星级: 31 页

  • 推荐】电脑故障查询和解决

    星级: 1 页

  • 推荐】电脑故障查询和解决

    星级: 1 页

  • 使用注入压力操作阀的连续气举井设计推荐作法

    星级: 77 页

暂无目录

点击鼠标右键菜单,创建目录

暂无笔记

选择文本,点击鼠标右键菜单,添加笔记

暂无书签

在左侧文档中,点击鼠标右键,添加书签

188宝金博页面版: API 19G9《双气举井的设计、操作和故障排查与解决推荐做法》

下载积分: 100

内容提示: API Recommended Practice 19G9 Design, Operation, and Troubleshooting of Dual Gas-lift Wells SECOND EDITION | APRIL 2015 | 90 PAGES | $165.00 | PRODUCT NO. G19G92This document provides recommended practices (RPs) for the selection, design, operation, surveillance, optimization, automation, and troubleshooting of dual gas-lift wells. The purpose of this document is to present RPs, guidelines, and tools to help obtain optimum production from dual gas-lift wells. This document also contains practices that sh...

文档格式:PDF | 页数:3 | 浏览次数:14 | 上传日期:2015-05-27 08:21:13 | 文档星级:
API Recommended Practice 19G9 Design, Operation, and Troubleshooting of Dual Gas-lift Wells SECOND EDITION | APRIL 2015 | 90 PAGES | $165.00 | PRODUCT NO. G19G92This document provides recommended practices (RPs) for the selection, design, operation, surveillance, optimization, automation, and troubleshooting of dual gas-lift wells. The purpose of this document is to present RPs, guidelines, and tools to help obtain optimum production from dual gas-lift wells. This document also contains practices that should be avoided to minimize problems and inefficiencies that can be associated with ineffective dual gas-lift operations. Compared to single completions, dual completions typically have more operating problems, are more difficult to work over, and can produce less efficiently. It is not the purpose of this document to recommend the practice of dual gas-lift. In some cases, dual gas-lift is problematic and often ineffective. Often it is difficult or even impossible to effectively produce both completions in a dual well using gas-lift over the long term. Where there are other feasible alternatives to produce dual wells, they should be considered. However, many dually completed oil wells should be artificially lifted initially or after reservoir pressures have declined and/or water cuts have increased. In many cases, the only practical method of artificial lift for these wells is gas-lift. Therefore, every effort should be made to design and operate dual gas-lift systems as effectively as possible. Annexes to this RP include: a)b)c)an overview of dual gas-lift systems, dual gas-lift mandrel spacing designs, dual gas-lift unloading valve design for production pressure operated (PPO) valves, and dual gas-lift practices not recommended. d)For ordering information: Online: www.api.org/pubs Phone: 1-800-854-7179 (Toll-free in the U.S. and Canada) (+1) 303-397-7056 (Local and International) Fax: (+1) 303-397-2740 API members receive a 30% discount where applicable. www.api.org

188宝金博页面版:关注我们

  • 新浪微博

关注188宝金博页面版公众号

188宝金博页面版
阅读
APP
阅读
返回
顶部
188宝金博页面版官网登录在线平台入口(2026已更新)—江苏协昌电子科技股份有限公司