188宝金博页面版

  • 图案背景
  • 纯色背景
视图
标记
批注
批注本地保存成功,开通会员云端永久保存 去开通
maturin

上传于:2016-02-26

粉丝量:74

工程与项目管理的专家。


  • 相关
  • 目录
  • 笔记
  • 书签

188宝金博页面版:更多相关文档

  • 《电磁场与电磁波(第4版)》勘误表1225

    星级: 5 页

  • API 6D-2009 管道阀门规范

    星级: 93 页

  • 电磁场与电磁波(第4版)勘误表

    星级: 5 页

  • API 6D管道阀门(第23版)解读

    星级: 4 页

  • API规范6D《管道阀门规范》第23版的重要修改

    星级: 4 页

  • API 管道阀门

    星级: 2 页

  • 王成优_“电磁场与电磁波”(第4版)勘误表.pdf

    星级: 5 页

  • API 6D 24版勘误表3(中文)

    星级: 1 页

  • API 13A《钻井液材料》第13版勘误表2已于2015年5月出版。

    星级: 5 页

  • API规范6D《管道阀门规范》第23版的重要修改

    星级: 8 页

  • API 1173《管道安全管理系统推荐做法》第1版已于2015年7月出版。

    星级: 3 页

暂无目录

点击鼠标右键菜单,创建目录

暂无笔记

选择文本,点击鼠标右键菜单,添加笔记

暂无书签

在左侧文档中,点击鼠标右键,添加书签

188宝金博页面版: API 6D《管道与管道阀门》第24版勘误表4已于2015年6月出版

下载积分: 100

内容提示: Date of Issue: September 2015 Affected Publication: API Specification 6D, Specification for Pipeline and Piping Valves, Twenty-fourth Edition, August 2014 ERRATA 6 (includes Errata 1, October 2014; Errata 2, December 2014; Errata 3, February 2015; Errata 4, June 2015; and Errata 5, July 2015 ) Page 2, Section 2, replace: ASME B31.4, Pipeline Transportation Systems for Liquid Hydrocarbons and Other Liquids, 2013 with ASME B31.4, Pipeline Transportation Systems for Liquid Hydrocarbons and Other Liquid...

文档格式:PDF | 页数:3 | 浏览次数:45 | 上传日期:2016-02-26 09:55:22 | 文档星级:
Date of Issue: September 2015 Affected Publication: API Specification 6D, Specification for Pipeline and Piping Valves, Twenty-fourth Edition, August 2014 ERRATA 6 (includes Errata 1, October 2014; Errata 2, December 2014; Errata 3, February 2015; Errata 4, June 2015; and Errata 5, July 2015 ) Page 2, Section 2, replace: ASME B31.4, Pipeline Transportation Systems for Liquid Hydrocarbons and Other Liquids, 2013 with ASME B31.4, Pipeline Transportation Systems for Liquid Hydrocarbons and Other Liquids, 2012 Page 4, Section 2, insert the following normative reference: SAE AMS 2750, Pyrometry Page 18, Section 5.13, 4 th paragraph, revise the 1 st sentence to read: Handwheel diameter(s) shall not exceed the 40 in. (1016 mm). Page 23, Section 6.10, insert the following sentence at the end of the section: Records of furnace calibration and surveys shall be maintained for a period not less than five years. Page 29, Section 9.2, revise the 4 th paragraph to read: Any visually detectable leakage during the test duration at test pressure on any external surface of the shell is cause for rejection. Page 32, Section 10, revise the 4 th paragraph to read: See Annex L for details on where coatings/paintings are not allowed.

188宝金博页面版:关注我们

  • 新浪微博

关注188宝金博页面版公众号

188宝金博页面版
阅读
APP
阅读
返回
顶部
188宝金博页面版官网登录在线平台入口(2026已更新)—江苏协昌电子科技股份有限公司