188宝金博页面版

  • 图案背景
  • 纯色背景
视图
标记
批注
批注本地保存成功,开通会员云端永久保存 去开通
bookoneyee..

上传于:2016-03-25

粉丝量:1

该文档贡献者很忙,什么也没留下。


  • 相关
  • 目录
  • 笔记
  • 书签

188宝金博页面版:更多相关文档

  • Strawberry Hill Elementary - City of Surrey

    星级: 3 页

  • draft - Horse Hill Nature Preserve

    星级: 4 页

  • Fungi from Cooper's Hill, Surrey

    星级: 2 页

  • 2009 Hill Country Cook-Off

    星级: 1 页

  • Surveying Horse Head Moor and Birks Fell - Hill Bagging

    星级: 4 页

  • Surveying Horse Head Moor and Birks Fell - Hill Bagging

    星级: 6 页

  • The structure of Bower Hill, Nutfield (Surrey)

    星级: 32 页

  • Report of an excursion to Tilburstow Hill and Nutfield, Surrey Saturday, June 26th, 1915

    星级: 3 页

  • Report of an excursion to White Horse Hill, Berkshire Saturday, June 29th, 1912

    星级: 3 页

  • Report of an Excursion to Tilburstow Hill and Godstone, Surrey Saturday, June 27th, 1914

    星级: 4 页

  • Specialty Performance Horse Practice, Hill Country …

    星级: 1 页

暂无目录

点击鼠标右键菜单,创建目录

暂无笔记

选择文本,点击鼠标右键菜单,添加笔记

暂无书签

在左侧文档中,点击鼠标右键,添加书签

188宝金博页面版: SUMMARY REPORT Land off Horse Hill, Hookwood, Horley, Surrey…

下载积分: 3000

内容提示: Item 7 1 TO: PLANNING & REGULATORY COMMITTEE DATE: 9 NOVEMBER 2011 BY: PLANNING DEVELOPMENT CONTROL TEAM MANAGER DISTRICT(S) REIGATE & BANSTEAD BOROUGH COUNCIL ELECTORAL DIVISION(S): Horley West Mrs Hammond PURPOSE: FOR DECISION GRID REF: 525304 143595 TITLE: MINERALS AND WASTE APPLICATION: RE10/2089 SUMMARY REPORT Land off Horse Hill, Hookwood, Horley, Surrey Construction of an exploratory wellsite to include plant, buildings and equipment; the use of the wellsite for the drilli...

文档格式:PDF | 页数:72 | 浏览次数:31 | 上传日期:2016-03-25 03:57:19 | 文档星级:
Item 7 1 TO: PLANNING & REGULATORY COMMITTEE DATE: 9 NOVEMBER 2011 BY: PLANNING DEVELOPMENT CONTROL TEAM MANAGER DISTRICT(S) REIGATE & BANSTEAD BOROUGH COUNCIL ELECTORAL DIVISION(S): Horley West Mrs Hammond PURPOSE: FOR DECISION GRID REF: 525304 143595 TITLE: MINERALS AND WASTE APPLICATION: RE10/2089 SUMMARY REPORT Land off Horse Hill, Hookwood, Horley, Surrey Construction of an exploratory wellsite to include plant, buildings and equipment; the use of the wellsite for the drilling of one exploratory borehole and the subsequent short term testing for hydrocarbons; the erection of security fencing; construction of a new access onto Horse Hill and an associated access track with passing bays, all on some 1.16 ha, for a temporary period of up to 3 years, with restoration to agriculture and woodland. The application is concerned with the first stage of on-shore hydrocarbon development – exploration. It would involve the construction of an above ground drillsite where following the drilling of an exploratory borehole, short term testing for hydrocarbons would take place to assess the prospect. The application is for a planning permission extending over a temporary period of three years. However, it is proposed that the site would only be operational for a 20 to 21 week period within the three year period. It is necessary to consider the proposal against European, National, Regional and Development Plan policies and assess the potential environmental and amenity impacts against those policies, the advice provided by statutory and non-statutory consultees and the views expressed by other bodies, groups and individuals. The Authority must be satisfied that the potential impacts arising from the development are acceptable in terms of the nearest residential properties and the local environment and amenities. The proposed hydrocarbon exploration site does not fall within an area, or site, designated for its landscape or nature conservation importance. It is however, located on farmland within a rural area in the Green Belt. A key issue is the need for the development. Despite a steady increase in the production of energy from renewable sources, oil and gas remain vital parts of the United Kingdom's (UK) energy mix and national energy policy seeks to secure reliability of supply. The Government's short to medium term aim set out in Minerals Policy Statement 1 (MPS1), is to 'maximise the potential of the UK's conventional oil and gas reserves in an environmentally acceptable manner'. In 2010 the Department of Energy and Climate Change (DECC) confirmed that the aim set out in MPS1 is still current and valid and DECC's website currently states, 'we aim to maximise the economic recovery of oil and gas from the UK's oil and gas reserves, taking full account of environmental, social and economic objectives'. The applicant has identified a hydrocarbon prospect and to maximise the potential of a reserve, it is first necessary to investigate and assess a prospective resource. Officers give significant weight to the statements made in MPS1 regarding the need to maximise the potential of the UK's

188宝金博页面版:关注我们

  • 新浪微博

关注188宝金博页面版公众号

188宝金博页面版
阅读
APP
阅读
返回
顶部
188宝金博页面版官网登录在线平台入口(2026已更新)—江苏协昌电子科技股份有限公司