188宝金博页面版

  • 图案背景
  • 纯色背景
视图
标记
批注
批注本地保存成功,开通会员云端永久保存 去开通
顾我

上传于:2012-02-23

粉丝量:95

该文档贡献者很忙,什么也没留下。


  • 相关
  • 目录
  • 笔记
  • 书签

188宝金博页面版:更多相关文档

  • 不错的监理周报范本

    星级: 4 页

  • 监理周报施工周报范本

    星级: 5 页

  • [精品]监理周报范本

    星级: 6 页

  • 监理周报范本

    星级: 6 页

  • [精品]监理周报范本

    星级: 3 页

  • 监理周报范本

    星级: 10 页

  • 监理周报表范本

    星级: 3 页

  • 监理周报范本

    星级: 3 页

  • 监理周报范本

    星级: 4 页

  • 监理周报(范本)

    星级: 5 页

  • 监理周报范本

    星级: 79 页

  • 监理周报范本

    星级: 1 页

  • 监理周报 范本

    星级: 3 页

  • 监理周报范本

    星级: 2 页

  • 监理周报格式范本

    星级: 1 页

暂无目录

点击鼠标右键菜单,创建目录

暂无笔记

选择文本,点击鼠标右键菜单,添加笔记

暂无书签

在左侧文档中,点击鼠标右键,添加书签

188宝金博页面版: 不错的监理周报范本

下载积分: 800

内容提示: 监理周报 Jianli Weekly Report 工程名称焊接器材威海有限公司厂房工程 日期Date: 2007.08、07 Project name : EV project 编号Serial Number 06 本周概况 General Situation of This Week 1, beam and slab formwork installation of office building level 3 was done. Steel bar fabrication and installation of beam was done as well. 1办公楼三层楼面梁、板模板支设梁钢筋制作、安装 2, east side retaining w...

文档格式:PDF | 页数:4 | 浏览次数:1000 | 上传日期:2012-02-23 19:01:54 | 文档星级:
监理周报 Jianli Weekly Report 工程名称焊接器材威海有限公司厂房工程 日期Date: 2007.08、07 Project name : EV project 编号Serial Number 06 本周概况 General Situation of This Week 1, beam and slab formwork installation of office building level 3 was done. Steel bar fabrication and installation of beam was done as well. 1办公楼三层楼面梁、板模板支设梁钢筋制作、安装 2, east side retaining wall construction was in progress. 2东面挡土墙毛石墙施工 3, backfill of warehouse foundation was done. 3厂房基础内回填土方; 4, wall and slab concrete pouring was done of water tank. 4:消防水池墙板混凝土施工 5, wall and slab steel bar installation and formwork installation of water tank were done. 5:消防游水池墙板钢筋安装、模板安装 1,column steel bar installation of office building level 3 was in progress. And formwork installation was in progress. 1办公楼进入三层柱钢筋安装阶段。模板支架搭设阶段’ 2, short column of warehouse foundation was almost done. Foundation bolts installation was almost done. 2厂房基础短基本结束,钢构地脚螺栓安装基本结束; 3, east side retaining wall construction was in progress. 3东侧挡土墙正在施工中, 4, wall and slab concrete pouring of water tank was done. 4:消防水池墙板混凝土结束; 5, backfill of warehouse foundation was done. 5:主厂房基础已回填土方; 1, mortar of retaining did not meet requirement and WJ was asked to redo. 1挡土墙施工质量砂浆灌缝不够密实,已要求总包加强管理, 对不合格的地方要作返工处理 2, big area backfill was done by big equipment and corner should be paid more attention. 2 :回填土大面积为机械回填,对角落及难点处人工回填,并采用打夯机夯实, 3, steel binding did not meet requirement and WJ has redone. 3水池钢筋绑扎、钢筋之间的间距不符合规范要求总包已整改符本周进度 情况 Progress of This Week 施工质量情况 Construction Quality Situation

188宝金博页面版:关注我们

  • 新浪微博

关注188宝金博页面版公众号

188宝金博页面版
阅读
APP
阅读
返回
顶部
188宝金博页面版官网登录在线平台入口(2026已更新)—江苏协昌电子科技股份有限公司